Tarmac Floor Screed

Tarmac s hi flow base is a free flowing self smoothing protein free industrial flooring underlayment system which is obtained by mixing water with a carefully selected pre blended formulation of high quality raw materials.
Tarmac floor screed. Tarmac fastscreedis a specially formulated cement for the site batching of rapid setting and rapid drying floor screeds. Our screed range includes traditional and prescribed screeds specialist packed flooring hi flow self levelling screeds and cemscreed screed binders. Each product is manufactured to bs en iso 9001 and bs en 14001 to ensure consistent quality throughout. It is thinner than conventional screeds making it the natural choice for underfloor heating systems.
List of tarmac screed products for sale at flow screed services delivering to london and the south east topflow screed a and topflow screed a thermio call us 01784 477 787 toggle navigation. Do you mean asphalt. Tarmac fastscreedcan be used to produce either bonded screeds unbonded screeds laid onto a damp proof membrane dpm or floating screeds. But there is an alternative that ticks all the right boxes topflow screed a from tarmac.
Topflow screed a made with a unique synthetic anhydrite binder in place of cement is pump applied due to its fluid consistency. Asphalt floor screed is made by combining specific bitumen s and aggregates with limestone filler. It provides a good smooth hard wearing floor surface which makes it popular in construction. A strong high quality floor screed ideal for all common floor finishes.
We are the largest supplier of factory produced screeds in the uk. Tarmac are the leading suppliers of screed. Available with and without fibres our factory produced truscreed fulfils higher strength requirements linked to faster drying times. This means that it is easier to lay covering areas of up to 2000m 2 in a day.
Achieve a perfect surface finish with tarmac s range of specialist packed flooring products from high performance self levelling screeds to our advanced range of binders. It s only been down just over a week but already there are cracks in the surface and he didn t roll it or trowel it level there are obvious ridges where it was poured from the bucket. The council workman laid a latex based screed over the floor.